Hello All,
I am trying to find an easy way to export measures for each time step in a non-linear analysis. For instance, I have 5 time steps, and I want the measures for each time step, so they can be compiled. I have found that the "analysis_name".res file will have the first and last time step, but it doesn't have anything for the other steps? I am working in Creo2.
Am I missing something?